Quality


How do we control quality?

Step 4. Assembly, Pressure Test Control
Assembly shall not be started until every part, technical drawing, material, size and tolerance are checked without mistake by the quality inspector and will be followed with pressure test. Requirements in API598, ISO5208 etc. standards will be strictly followed for valve inspection and test.

No defective product are allowed to be accepted, made and sentout.